Balance of Plant and Miscellaneous Works

No Description Scope of Work Location Owner
11 Mechanical Erection Work for 2 x 35MW, Tonasa Power Plant Mechanical Makassar, Indonesia PT. Tonasa Semen
12 Arun LNG Receiving Hub & Regasification Terminal Mechanical Lhokseumawe, North Aceh PT. Perta Arun Gas (Persero)
13 Engineering, Procurement and Construction BOP Piping Work for Coal Fire Boiler 2 x 135MW Piping Babelan, Bekasi PT. Cikarang Listrindo
14 Installation of Air Cooled Steam Condenser (Acc) for Coal Fire Boiler 2 x 135MW Mechanical Babelan, Bekasi PT. Cikarang Listrindo
15 Electrical and Instrumentation Cables Installation for 2 (Two) PKR Frigates 10514 Electrical & Instrumentation PT PAL Dry Dock Indonesia Navy
16 Geothermal Power Plant Maintenance Supervisor Maintenance, Supervision Tapanuli Utara Sarulla Operation Ltd
17 Assembly and Erection of Boiler Coal Bunker at 2 x 1,000MW Batang Power Plant at Central of Java Mechanical Batang, Central of Java P.L.N
18 Erection of A/H, Fans and Boiler Bottom Ask Disposal System at 2 x 1,000MW Batang Power Plant at Central of Java Mechanical Batang, Central of Java P.L.N
19 Erection of Turbine Piping for 2 x 1,000MW Batang Power Plant at Central of Java Mechanical Batang, Central of Java P.L.N